Riverland Solar Storage
South Australia

Riverland Solar Storage is two kilometres to the east of the North-West Bend substation. The site fronts the highway east of Morgan and was previously used for cattle grazing. It will connect to the two existing ElectraNet transmission lines that run through the site.

Scroll down
Solar capacity 253MWac (up to 330MWac solar including stage 2)
Storage peak / capacity 100MW / 400MWh
Site 600 hectares

Project Announcement March 2017 (view the media release)
First community consultation forum May 2017 (view the media release)
Development application submitted July 2017
Connection application submitted August 2017
Development application approved November 2017 (view the media release)
Offer to connect issued Pending
Error: